产品展示

产品展示

current position: Home > Product Center > Purification Engineering

ContactContact

Shenzhen Youngsun Technology Co., Ltd

Contact: 13715227878 Ms. Wang

Tel: 0755-23206030

       0755-33691097

       0755-33691098

After-sales service: 13808833607

Website: www.ys-esd.com

                http://yongskj.1688.com

E-mail: eileen001@ys-esd.com

Address: 11th Floor, Baishunjia Technology Building, No. 16 Shuotai Road, Loucun, Guangming New District, Shenzhen

Cleanroom, dust-free workshop, air shower room

Cleanroom, dust-free workshop, air shower room

  • Category:Purification Engineering
  • Browse number:
  • QR code:
  • Release time:2024-07-20 17:44:11
  • Detail

Cleanroom Engineering Renovation Plan


Xiang Chang Overview


In order to meet the clean requirements of the company's production process, it is very necessary to carry out engineering renovation of the cleanroom. This project is to renovate the cleanroom to meet the GMP production requirements and achieve a clean, dust-free and sterile production environment. This article will describe the design requirements, decoration material selection, engineering construction process and budget of the cleanroom in detail, and provide a comprehensive cleanroom engineering renovation plan.


Design requirements


1. Clean level: The cleanroom purification level is GMP-C level, and the indoor air cleanliness is required to meet the 10000 level standard.


2. Material requirements: Wall, floor and ceiling materials should be made of antibacterial, corrosion-resistant, easy-to-clean antistatic materials to ensure the environmental hygiene of the cleanroom.


3. Air conditioning requirements: An efficient purification air conditioning system should be installed inside the cleanroom to maintain the stability of indoor temperature, humidity and cleanliness, and ensure air circulation inside the cleanroom.


4. Lighting requirements: Clean workshops need to have sufficient lighting facilities, and the lighting equipment must be airtight and explosion-proof.


5. Purification equipment: In order to achieve the clean level of the clean workshop, it is necessary to configure appropriate purification equipment inside the clean workshop, such as air purifiers, high-efficiency filters, etc.


6. Safety protection: Safety doors, sprinklers and alarm systems should be installed inside the clean workshop to ensure production safety


7. Material storage: Clean workshops require reasonable material storage facilities to ensure the quality and safety of raw materials, semi-finished products and finished products



 


Recently Viewed:

Related products

Related news

  • menu
Copyright © Shenzhen Youngsun Technology Co., Ltd record number:粤ICP13035942号 Technical Support: huaqilifang

Some of the texts and images used on this website are from the public network or material websites. All unsigned images and texts are original, but the author can inform and claim them after discovering them. We will promptly sign them or handle them according to the author's wishes. If you fail to contact this website in time, this website does not assume any responsibility.